Well-designed Gas Pipe Clamp - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We always get the job done being a tangible workforce making sure that we can easily give you the very best quality as well as finest selling price for Steel Pipe And Fittings , Quick Release Connector Hose , Universal Hose Coupling , With a rapid advancement and our buyers come from Europe, United States, Africa and everywhere in the world. Welcome to visit our manufacturing unit and welcome your order, for further more inquires be sure to don't hesitate to get hold of us!
Well-designed Gas Pipe Clamp - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

Well-designed Gas Pipe Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

Well-designed Gas Pipe Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

Well-designed Gas Pipe Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

Well-designed Gas Pipe Clamp -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

To create more benefit for buyers is our business philosophy; shopper growing is our working chase for Well-designed Gas Pipe Clamp - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: Manchester , Austria , Islamabad , Our experience makes us important in our customer eyes. Our quality speaks itself the properties like it do not tangle, shed or breakdown, so that are our customers will always be confident while placing an order.
  • The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Marcy Real from Georgia - 2017.08.15 12:36
    This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Gemma from Portland - 2018.06.09 12:42
    Write your message here and send it to us