Special Design for Kee Clamp Pipe Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Each individual member from our large performance revenue crew values customers' needs and company communication for Gas Pipe Fitting In Kitchen , Water Pipe Saddle Clamp , Clamp For Pipe , Our professional technical team will be wholeheartedly at your service. We sincerely welcome you to visit our website and company and send us your inquiry.
Special Design for Kee Clamp Pipe Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Special Design for Kee Clamp Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

Special Design for Kee Clamp Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

Special Design for Kee Clamp Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

Special Design for Kee Clamp Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

Special Design for Kee Clamp Pipe Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We believe in: Innovation is our soul and spirit. Quality is our life. Shopper need is our God for Special Design for Kee Clamp Pipe Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Belize , Swedish , Vancouver , Customer's satisfaction is always our quest, creating value for customers is always our duty, a long term mutual-beneficial business relationship is what we are doing for. We are an absolutely reliable partner for you in China. Of course, other services, like consulting, can be offered too.
  • The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Hilary from London - 2018.02.04 14:13
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Sarah from Uganda - 2018.09.12 17:18
    Write your message here and send it to us