Short Lead Time for Electrical Pipe Fittings - Valve – Donghuan
Short Lead Time for Electrical Pipe Fittings - Valve – Donghuan Detail:
Details
Norminal Diameter | DN15-DN50, can be customized |
Norminal Pressure | 1.6Mpa |
Working Medium | Water, Non-causticity liquid, Saturated steam |
Working Temperature | -10°C≤T≤110°C |
1.Material: Malleable iron/ brass
2.Fields of applications :Water & Gas
3.Threads: ISO7/1
4.Nominal Pressure: 1.6MPa
5.Test Pressure: 2.4 MPa
6.Suitable Temperature:<=200 °C
7.Used materials: valve body: malleable cast iron; head body, stem, disc, adjustable stem nut: brass; handwheel: cast iron; valve disc seal: rubber; adjustable stem nut seal: EPDM rubber; valve head seal: fibre
8.Suitable Medium: water, steam, oil
9.Size Available: 1/2’’—2’’
10.Surface : Body with Hot dip galvanized
11. Product specification
Pictures |
Size |
unite weight g |
Work parameters |
Packing | |
|
1/2 |
320 |
PN 10, 100°C |
A self-sealing bag with a label,then put one carton |
|
3/4 |
550 |
PN 10, 100°C |
|||
|
1/2 |
6 |
PN 10, 100°C |
||
3/4 |
8 |
PN 10, 100°C |
|||
![]() |
1/2 |
285 |
PN 10, 100°C |
||
3/4 |
450 |
PN 10, 100°C |
|||
1 |
645 |
PN 10, 100°C |
|||
1-1/4 |
1015 |
PN 10, 100°C |
|||
1-1/2 |
1607 |
PN 10, 100°C |
|||
2 |
2423 |
PN 10, 100°C |
11. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
12. Packing detail: Packed in cartons then on pallets; or as each customer requirement.
13. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
14. Quantity tolerance: 15% .
Comments
Handel Material: Brass
Fields of applications :Water & Gas
Working Temperature:-20℃,+120℃
Packaging :Standard export package or Customized
Payment: L/C,T/T,Western Union
Loading port:Tianjin Port
Product detail pictures:











Related Product Guide:
High-quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is constantly observed and pursued by our business for Short Lead Time for Electrical Pipe Fittings - Valve – Donghuan , The product will supply to all over the world, such as: Czech Republic , Stuttgart , Libya , we have all day online sales to make sure the pre-sale and after-sale service in time. With all these supports, we can serve every customer with quality product and timely shipping with highly responsibility. Being a young growing company, we might not the best, but we are trying our best to be your good partner.

The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
