Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our enhancement depends around the sophisticated devices ,exceptional talents and repeatedly strengthened technology forces for Water Heater Pipe Fittings , Tube Clamp Casting , Coupling Connector For Hose , Welcome all nice buyers communicate details of products and ideas with us!!
Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

With responsible good quality method, good status and excellent client services, the series of solutions produced by our company are exported to lots of countries and regions for Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Orlando , Comoros , Czech republic , We also have good cooperation relationships with many good manufacturers so that we can provide almost all of auto parts and after-sales service with high quality standard,lower price level and warmly service to meet demands of customers from different fields and different area.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Josephine from Thailand - 2017.11.11 11:41
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Dorothy from Vancouver - 2017.09.09 10:18
    Write your message here and send it to us