Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The key to our success is "Good Products Good quality, Reasonable Value and Efficient Service" for Quick Connect Fittings For Water Hose , Aluminum Camlock , Galvanized Pipe Clamp , If you are interested in any of our products, please feel free to contact us for more details. We hope to cooperate with more friends from all over the world.
Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We emphasize progress and introduce new merchandise into the market each and every year for Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Brazil , Frankfurt , Ecuador , Our solutions are widely recognized and trusted by users and can meet continuously changing of economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
  • Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Polly from Casablanca - 2018.12.28 15:18
    The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Quintina from Kyrgyzstan - 2018.09.21 11:44
    Write your message here and send it to us