Online Exporter Cast Iron Tee Fitting - Double Bolt Clamps – Donghuan
Online Exporter Cast Iron Tee Fitting - Double Bolt Clamps – Donghuan Detail:
Details
1. Inner surface has dual gripping ridges
2. Bolts lugs are reinforced to prevent bending out of alignment
3. Measure hose OD accurately before ordering clamps
4. Torque values for clamps are based on dry bolts. The use of lubricant on bolts will adversely affect clamp performance
Double Bolt clamps size list as below:
Name | code | size | rang size | Note | Colour |
double bolt clamp | DB | SL-22 | 20-22mm | Without saddles | Yellow |
double bolt clamp | DB | SL-29 | 22-29mm | ||
double bolt clamp | DB | SL-34 | 29-34mm | ||
double bolt clamp | DB | SL-40 | 34-40mm | ||
double bolt clamp | DB | SL-49 | 40-49mm | ||
double bolt clamp | DB | SL-60 | 49-60mm | Carbon steel saddles | |
double bolt clamp | DB | SL-76 | 60-76mm | ||
double bolt clamp | DB | SL-94 | 76-94mm | ||
double bolt clamp | DB | SL-115 | 94-115mm | ||
double bolt clamp | DB | SL-400 | 90-100mm | ||
double bolt clamp | DB | SL-525 | 100-125mm | Malleable iron saddles | White |
double bolt clamp | DB | SL-550 | 125-150mm | ||
double bolt clamp | DB | SL-675 | 150-175mm | ||
double bolt clamp | DB | SL-769 | 175-200mm | ||
double bolt clamp | DB | SL-818 | 200-225mm | ||
double bolt clamp | DB | SL-988 | 225-250mm | ||
double bolt clamp | DB | SL-1125 | 250-300mm | ||
double bolt clamp | DB | SL-1275 | 300-350mm |
6.instruction for double bolt clamps Firstly, check the pipe end surface and assure that the pipe is smooth, then aligning two piece of clamps and insert the bolt and connect them, finally hand tighten nuts make sure oval next bolt completely fits into bolt hole. Please make sure you use a wrench.
7.MILL TEST REPORT
Description: Double bolt clamps
Description |
Chemical Properties |
Physical Properties |
|||||
Lot No. |
C |
Si |
Mn |
P |
S |
Tensile Strength |
Elongation |
ALL PALLET |
2.76 |
1.65 |
0.55 |
LESS THAN 0.07 |
LESS THAN 0.15 |
300 Mpa |
6% |
8. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
9. Packing detail: Packed in cartons then on pallets;
10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
11. Quantity tolerance: 15% .
Product detail pictures:
Related Product Guide:
To meet the customers' over-expected satisfaction , we have our strong team to provide our best overall service which includes marketing, sales, designing, production, quality controlling, packing, warehousing and logistics for Online Exporter Cast Iron Tee Fitting - Double Bolt Clamps – Donghuan , The product will supply to all over the world, such as: United States , Canada , United States , If you are for any reason unsure which product to select, do not hesitate to contact us and we are going to be delighted to advise and assist you. This way we are going to be providing you with all the knowledge needed to make the best choice. Our company strictly follows "Survive by good quality, Develop by keeping good credit. " operation policy. Welcome all the clients old and new to visit our company and talk about the business. We have been looking for more and more customers to create the glorious future.
By Denise from Russia - 2018.12.05 13:53
This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
By Mabel from Jamaica - 2017.07.28 15:46