Newly Arrival Copper Pipes And Fittings - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our goal is to satisfy our customers by offering golden service, good price and high quality for Quick Release Tube Clamp , Cast Iron Elbow Fitting , Tube To Tube Clamp , Your inquiry might be extremely welcomed plus a win-win prosperous development are what we've been expecting.
Newly Arrival Copper Pipes And Fittings - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

Newly Arrival Copper Pipes And Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Newly Arrival Copper Pipes And Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Newly Arrival Copper Pipes And Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Newly Arrival Copper Pipes And Fittings -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Sticking to the principle of "Super Quality, Satisfactory service" ,We are striving to be a good business partner of you for Newly Arrival Copper Pipes And Fittings - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: Sierra Leone , Cannes , Nigeria , Since its foundation , the company keeps living up to the belief of "honest selling , best quality , people-orientation and benefits to customers. " We're doing everything to supply our customers with best services and best solutions . We promise that we are going to be responsible all the way to the end once our services begin.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Penny from Estonia - 2017.12.09 14:01
    The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Jason from Kazakhstan - 2018.12.10 19:03
    Write your message here and send it to us