Manufacturing Companies for Tee Clamp Pipe - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our mission will be to grow to be an innovative supplier of high-tech digital and communication devices by giving worth added design and style, world-class production, and service capabilities for Clamp To Hold Pipe , Air Hose Swivel Connector , Square Tube Clamp , We warmly welcome you to establish cooperation and create a bright future together with us.
Manufacturing Companies for Tee Clamp Pipe - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

With this motto in mind, we have turn out to be amongst probably the most technologically innovative, cost-efficient, and price-competitive manufacturers for Manufacturing Companies for Tee Clamp Pipe - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Ottawa , Angola , Italy , We have won a good reputation among overseas and domestic clients. Adhering to the management tenet of "credit oriented, customer first, high efficiency and mature services", we warmly welcome friends from all walks of life to cooperate with us.
  • The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Teresa from Sierra Leone - 2017.06.16 18:23
    The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Matthew from Ghana - 2017.06.29 18:55
    Write your message here and send it to us