Manufacturing Companies for Tee Clamp Pipe - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Innovation, excellent and reliability are the core values of our business. These principles today extra than ever form the basis of our success as an internationally active mid-size company for Pipe Connector Clamp , Pipe Saddle Clamp , Industrial Hose Couplings , Honesty is our principle, skilled procedure is our perform, service is our target, and customers' satisfaction is our long term!
Manufacturing Companies for Tee Clamp Pipe - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures

Manufacturing Companies for Tee Clamp Pipe -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We aim to find out high quality disfigurement in the generation and provide the most effective services to domestic and abroad clients wholeheartedly for Manufacturing Companies for Tee Clamp Pipe - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Korea , Mexico , India , Now the competition in this field is very fierce; but we will still offer best quality, reasonable price and most considerate service in an endeavor to achieve win-win goal. "Change for the better!" is our slogan, which means "A better world is before us, so let's enjoy it!" Change for the better! Are you ready?
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Elvira from St. Petersburg - 2017.12.02 14:11
    Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Candy from Sheffield - 2018.02.21 12:14
    Write your message here and send it to us