Manufactur standard British Pipe Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" could be the persistent conception of our organization for your long-term to establish alongside one another with shoppers for mutual reciprocity and mutual benefit for Eletric Hose Clamps , Clamp For Pipe Fitting , Iron Plumbing Fittings , We always regard the technology and prospects as the uppermost. We always function hard to make terrific values for our prospects and give our customers far better products and solutions & solutions.
Manufactur standard British Pipe Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Manufactur standard British Pipe Clamps -
 Fast Coupling – Donghuan detail pictures

Manufactur standard British Pipe Clamps -
 Fast Coupling – Donghuan detail pictures

Manufactur standard British Pipe Clamps -
 Fast Coupling – Donghuan detail pictures

Manufactur standard British Pipe Clamps -
 Fast Coupling – Donghuan detail pictures

Manufactur standard British Pipe Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our firm to the long-term to develop together with consumers for mutual reciprocity and mutual advantage for Manufactur standard British Pipe Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Kazakhstan , Berlin , Danish , At Present, our products have been exported to more than sixty countries and different regions, such as Southeast Asia, America, Africa, Eastern Europe, Russia, Canada etc. We sincerely hope to establish wide contact with all potential customers both in China and the rest part of the world.
  • The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Victor from Norwegian - 2018.09.19 18:37
    We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Maureen from Johannesburg - 2018.12.05 13:53
    Write your message here and send it to us