High definition Steel Gas Pipe Fittings - Conduit Body – Donghuan
High definition Steel Gas Pipe Fittings - Conduit Body – Donghuan Detail:
Electric fittings
From 2012 our factory begin to produce the electric fittings, at first we produce conduit body, including (LL,LR, LB,T) with malleable iron, then enlarge the other items. Now we can produce the Guat, bushing, EYS, Lt connector with lugs, lt connector without lugs, union, enlarger, close nipple, drain breather, cover, aluminum lugs etc. In the beginning we use the black sand mould to produce, then we improve step by step, now we all revised the new mould with yellow sand, the thread is maked by CNC machine. The surface we mainly make now is electric, but also can make with hot-dip galvanized firstly then electric. Also for the new item we also have the experienced to open the mould, if you are interested welcome to contact with us.
Usage
Conduit bodies are used to gain access to the interior of a raceway for wire pulling, inspection and maintenance where the raceway changes direction. Allows connection of straight conduit runs, branch conduit runs and 90° bends. The union used for joining conduits, or conduit to enclosures or other devices, without rotation of conduits, etc. Allows future access and removal of system components.
Types: Conduit fittings
Produce name | SIZE | PACKAGE |
LL | 3/4,1,1-1/2,2 | In small box then in big carton |
LR | 3/4,1,1-1/2,2 | In small box then in big carton |
LB | 3/4,1,1-1/2,2 | In small box then in big carton |
T | 3/4,1,1-1/2,2 | In small box then in big carton |
GUAT | 1/2,3/4,1, | In small box then in big carton |
BUSHING | 3/4,1,1-1/4,1-1/2,2,2-1/2,3,4 | In small box then in big carton |
UNION | 3/4,1,1-1/2,2 | In small box then in big carton |
COVER | 3/4,1,1-1/2,2 | In small box then in big carton |
LT CONNECTOR | 3/4,1,1-1/4 | In small box then in big carton |
Material
1.Bodies—Malleable iron with electrogalvanized
2.Gaskets—Neoprene
3.Cover—Malleable iron or carbon steel
4.Cover Screws—Stainless steel
5. Size: 3/4’’-2’’
6. Thread: NPT
7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
8. Packing detail: Packed in cartons then on pallets;
9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
10. Quantity tolerance: 15% .
Product detail pictures:



















Related Product Guide:
Being supported by an state-of-the-art and skilled IT team, we could supply technical support on pre-sales & after-sales service for High definition Steel Gas Pipe Fittings - Conduit Body – Donghuan , The product will supply to all over the world, such as: Paraguay , Wellington , Detroit , Adhering to the principle of "Enterprising and Truth-Seeking, Preciseness and Unity", with technology as the core, our company continues to innovate, dedicated to providing you with the highest cost-effective products and meticulous after-sales service. We firmly believe that: we are outstanding as we are specialized.

Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
