Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We emphasize advancement and introduce new products and solutions into the market each year for American Standard Fittings , Underground Soil Pipe Fittings , Metal Gas Pipe Fittings , To learn more about what we can easily do in your case, make contact with us at any time. We glance forward to developing superior and long-term organization interactions along with you.
Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We've our have sales staff, style and design staff, technical crew, QC team and package workforce. We've strict excellent control procedures for each system. Also, all of our workers are experienced in printing field for Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Spain , Angola , Orlando , As an experienced factory we also accept customized order and make it same as your picture or sample specifying specification and customer design packing. The main goal of the company is to live a satisfactory memory to all the customers, and establish a long term win-win business relationship. For more information, please contact us. And It is our great pleasure if you like to have a personally meeting in our office.
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Debby from Malawi - 2018.11.04 10:32
    A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Penny from Poland - 2018.09.21 11:44
    Write your message here and send it to us