factory Outlets for Malleable Iron Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our pursuit and company intention is usually to "Always fulfill our purchaser requirements". We go on to acquire and layout excellent high quality products for both our previous and new consumers and realize a win-win prospect for our customers too as us for Tee , Air Hose Connector Types , Gi Clamp For Pipe , Our products are widely used in many industrial fields. Our Company Services Division in good faith for the purpose of the quality of survival. All for customer service.
factory Outlets for Malleable Iron Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

With a complete scientific quality management system, good quality and good faith, we win good reputation and occupied this field for factory Outlets for Malleable Iron Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Vietnam , Oslo , Russia , Our company has always insisted on the business principle of "Quality, Honest, and Customer First" by which we have won the trust of clients both from at home and abroad. If you are interested in our solutions, you should do not hesitate to contact us for further information.
  • It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Claire from Latvia - 2018.11.22 12:28
    In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.
    5 Stars By Ricardo from France - 2018.05.13 17:00
    Write your message here and send it to us