Factory making Pipeline Clamps - Sockets – Donghuan
Factory making Pipeline Clamps - Sockets – Donghuan Detail:
Details
1.Carbon steel hose menders have precise sized, better mechanical behavior and tightness, and used widely in construction energy, processing, and fabrication industries.
2. We provide a comprehensive range of Carbon Steel Nipple. And it is been manufactured by technical team using high grade carbon steel & technologically advance machinery.
3.Hose Menders specification:
A | B | C&D | E | F | G | H | |
1/2*1-1/4 |
24 |
18 |
NPT 1/2″ |
23 |
28 |
16 |
26.5 |
1/2*1-1/2 |
24 |
18 |
NPT 1/2″ |
23 |
28 |
16 |
26.5 |
1/2*2 |
24 |
18 |
NPT 1/2″ |
23 |
28 |
16 |
26.5 |
3/4*1-1/4 |
27 |
23 |
NPT 3/4″ |
27 |
32 |
20 |
29 |
3/4*1-1/2 |
27 |
23 |
NPT 3/4″ |
27 |
32 |
20 |
29 |
3/4*2 |
27 |
23 |
NPT 3/4″ |
27 |
32 |
20 |
29 |
1*1-1/2 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
1*2 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
1*2-1/2 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
1*3 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
1*4 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
1-1/4*2 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
1-1/4*2-1/2 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
1-1/4*3 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
1-1/4*4 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
1-1/4*6-8 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
1-1/2*2-1/2 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
1-1/2*3 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
1-1/2*4 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
1-1/2*5-6 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
2*2-1/2 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
2*3 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
2*4 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
2*6 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
2-1/2*3 |
74 |
66.5 |
NPT 2-1/2″ |
76 |
80.5 |
28 |
45 |
2-1/2*4 |
74 |
66.5 |
NPT 2-1/2″ |
76 |
80.5 |
28 |
45 |
2-1/2*6 |
74 |
66.5 |
NPT 2-1/2″ |
76 |
80.5 |
28 |
45 |
5. Surface: Zinc-plated, unplated4. Material: Carbon steel;
Note: zinc-plated steel for better corrosion resistance than unplated steel, prevent rust and weathering.
6. The working pressure varies with the construction of the hose, and the application shall not exceed the working pressure of the lowest rated component in the hose system.
7. We can produce according to your requirement size and drawings.
8. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
9. Packing detail: Packed in cartons then on pallets;
10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
11. Quantity tolerance: 15% .
Product detail pictures:
Related Product Guide:
Our firm aims to operating faithfully, serving to all of our consumers , and working in new technology and new machine continually for Factory making Pipeline Clamps - Sockets – Donghuan , The product will supply to all over the world, such as: Oman , Germany , Italy , The working experience in the field has helped us forged a strong relations with customers and partners both in domestic and international market. For years, our products and solutions have been exported to more than 15 countries in the world and have been widely used by customers.
By Tyler Larson from San Diego - 2017.12.31 14:53
Speaking of this cooperation with the Chinese manufacturer, I just want to say"well dodne", we are very satisfied.
By Sabina from Adelaide - 2017.07.28 15:46