Factory Free sample Adjustable Pipe Clamps - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We always continually offer you by far the most conscientious customer service, and the widest variety of designs and styles with finest materials. These attempts include the availability of customized designs with speed and dispatch for Pipe Clamps Ireland , Copper Pipe Clamps , Galvanized Pipe Clamp , For more information, please contact us as soon as possible!
Factory Free sample Adjustable Pipe Clamps - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

Factory Free sample Adjustable Pipe Clamps -
 Meter Suivel Offsets – Donghuan detail pictures

Factory Free sample Adjustable Pipe Clamps -
 Meter Suivel Offsets – Donghuan detail pictures

Factory Free sample Adjustable Pipe Clamps -
 Meter Suivel Offsets – Donghuan detail pictures

Factory Free sample Adjustable Pipe Clamps -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Our growth depends to the superior products ,great talents and repeatedly strengthened technology forces for Factory Free sample Adjustable Pipe Clamps - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: kazakhstan , Russia , Uzbekistan , We taking advantage of experience workmanship, scientific administration and advanced equipment, ensure the product quality of production, we not only win the customers' faith, but also build up our brand. Today, our team is committed to innovation, and enlightenment and fusion with constant practice and outstanding wisdom and philosophy, we cater to the market demand for high-end products, to do professional products.
  • The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Kama from Ecuador - 2018.06.03 10:17
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Lindsay from Bangalore - 2018.09.21 11:44
    Write your message here and send it to us