2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for Black Iron Cross Fitting , Different Types Of Pipe Fittings , Hose End Quick Connectors , We sincerely welcome clients from both of those at your home and overseas to occur to barter business enterprise with us.
2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We're committed to providing easy,time-saving and money-saving one-stop purchasing service of consumer for 2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Washington , Nepal , Angola , The credibility is the priority, and the service is the vitality. We promise we have the ability to provide excellent quality and reasonable price products for customers. With us, your safety is guaranteed.
  • The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Dee Lopez from Munich - 2018.12.25 12:43
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By ron gravatt from Lebanon - 2017.02.14 13:19
    Write your message here and send it to us