2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Quality to start with, Honesty as base, Sincere company and mutual profit" is our idea, as a way to build constantly and pursue the excellence for Pipe Wall Clamp , Copper Gas Pipe Fittings , Hose Pipe Coupling Joint , Now we have extensive goods source as well as price tag is our advantage. Welcome to inquire about our products and solutions.
2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

The corporate keeps towards the operation concept "scientific administration, superior quality and performance primacy, client supreme for 2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Victoria , Hungary , Mongolia , we are fully determined to control the whole supply chain so as to provide quality products at competitive price in a timely manner. We are keeping up with the advanced techniques, growing through creating more values for our clients and society.
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Teresa from Qatar - 2017.09.30 16:36
    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Chris Fountas from Ecuador - 2017.04.28 15:45
    Write your message here and send it to us